These are just some of the projects we’ve completed here at Hydracrete Pumping, from pumping up 38 stories to pumping down and out 2500 feet we can conquer anything you throw our way. There’s no job too big nor too small, we will handle it with ease. Don’t Dump It… Pump It!
Get in ContactThe Cleveland US court house foundation pour was the biggest single pour in the city of Cleveland where Hydracrete Pumping pumped 8500 yards.
Cleveland Port Authority completely repaved the port of Cleveland with 18 inches thick of concrete, where we pumped over 25,000 yards of concrete.
Timken Steel Mill: we’ve pumped over 150,000 yards over the years we’ve been here, using mainly our big booms with the 63meter and 56meter.
The Cleveland US court house foundation pour was the biggest single pour in the city of Cleveland where Hydracrete Pumping pumped 8500 yards.
Cleveland Port Authority completely repaved the port of Cleveland with 18 inches thick of concrete, where we pumped over 25,000 yards of concrete.
Timken Steel Mill: we’ve pumped over 150,000 yards over the years we’ve been here, using mainly our big booms with the 63meter and 56meter.
The Sherwin-Williams Global HQ is a 39 story high rise with a 6 story parking garage. We use a 39 meter schwing placing boom with a schwing BP 8800 trailer pump down below
The Sherwin-Williams Global HQ is a 39 story high rise with a 6 story parking garage. We use a 39 meter schwing placing boom with a schwing BP 8800 trailer pump down below
We pumped all the concrete for progressive field and the contractor rented our 52 meter and operator every single day for 5 months straight
The Mill Creek tunnel project was 10 year long project and pumped over 230,000 yards of concrete. With the longest line job of going down the shaft of the tunnel 300ft and then out horizontal 2,200ft with a total of 2,500ft of pipe pumping off the back end of one of our high pressure 36 meters.
We pumped all the concrete for progressive field and the contractor rented our 52 meter and operator every single day for 5 months straight
The Mill Creek tunnel project was 10 year long project and pumped over 230,000 yards of concrete. With the longest line job of going down the shaft of the tunnel 300ft and then out horizontal 2000ft with a total of 2,300ft of pipe pumping off the back end of one of our high pressure 36 meters.
Perry Nuclear Power Plant pumped around 60,000 yards of concrete.
Cleveland Innerbelt Bridge we pumped over 70,000 yards at the innerbelt bridge with some of the columns being over 1,000 yards.
With having the widest selection of pumps in the city with our smallest pump at 20 meters and largest pump in Ohio at 63 meters we can help you with any sized project that you throw our way.
With being in the city of Cleveland we can insure to serve you with efficiency and certainness.
We operate a fleet of Putzmeister pumps which is the industry’s leading manufacturer for quality and reliability.
With the hundreds of years of combined experience, we insure to have a safe and efficient job every time, and if a problem were to come up we can handle it and keep the job going.